| TSMC AP7 Taipei, Taiwan |
||
| Project Period | : | 2024-2026 |
| Façade type/System | : | Unitized Curtain Wall and Horizontal Sunshade |
| Facade Area | : | Unitized CW = 16,227 m.2 and Horizontal Sunshade = 2,711 lm |
| Scope of Work | : | Design, SDW, Eng, BoM, Fab Dwg, Material Procurement, Fabrication and CIF Shipping |
| Property Owner | : | Taiwan Semiconductor Manufacturing Co., Ltd |
| Developer | : | Taiwan Semiconductor Manufacturing Co., Ltd |
| Local Architectural | : | JJP Architects & Planners |
| Façade Consultant | : | Siang Bo Metal Building Material Co., Ltd |
| Main Contractor | : | Kedge Construction Co., Ltd |
| Taiwan Exclusive Representative | : | Interarch Engineering Solution Co., Ltd/ Kinzi (Thailand) Co., Ltd |
| In Collaboration With | : | – |
© 2015 KASKAL CO.,LTD. All rights reserved.
contact admin: info@kaskalthai.com
contact admin: info@kaskalthai.com