| Brunswick Phase 1 Bradford Road, M40 7EZ, Manchester, UK |
||
| Project Period | : | 2024-2026 |
| Façade type/System | : | Unitized Block Window |
| Facade Area | : | 2,420 m.2 |
| Scope of Work | : | BoM, Fabrication Drawing, Material Procurement, Fabrication and Ex-works Shipping |
| Property Owner | : | – |
| Developer | : | Arrowsmith Group (Developing Profitable Properties) |
| Construction Manager | : | – |
| Local Architectural | : | Hodder+Partners |
| Structural Designer | : | WW Structural Consultant |
| Quantity Surveyor | : | – |
| Façade Consultant | : | – |
| Façade Contractor | : | Craft Façade Tech (Hong Kong) Co Ltd / Craft Contracting Ltd UK |
| Main Contractor | : | Big Red Construction Group Ltd |
| In Collaboration With | : | – |
© 2015 KASKAL CO.,LTD. All rights reserved.
contact admin: info@kaskalthai.com
contact admin: info@kaskalthai.com