East Edge
Symonston, ACT, Australia
Project Period : 2022 – 2023
Façade type/System : Unitized CW w/Hor Fin, Unitized WW w/Above Air Seal, Alum Single Louver, Alum Cladding and Doors
Project Area : CW & WW = 1,598 m.2, Louver = 412 m.2, Cladding = 1,702 m.2 (Only CL01 Still Not Include CL02), Total 3,712 m.2
Scope of Work : Production Drawing & BoM, Material Supply, Fabrication and FOB Shipping
Local Architectural : Turco and Associates Architects
Main Contractor : Manteena Group
In Collaboration With : Tilton Façade Pty Ltd.