Brunswick Phase 1
Bradford Road, M40 7EZ, Manchester, UK
Project Period : 2024-2026
Façade type/System : Unitized Block Window
Facade Area : 2,420 m.2
Scope of Work : BoM, Fabrication Drawing, Material Procurement, Fabrication and Ex-works Shipping
Property Owner :
Developer : Arrowsmith Group (Developing Profitable Properties)
Construction Manager :
Local Architectural : Hodder+Partners
Structural Designer : WW Structural Consultant
Quantity Surveyor :
Façade Consultant :
Façade Contractor : Craft Façade Tech (Hong Kong) Co Ltd / Craft Contracting Ltd UK
Main Contractor : Big Red Construction Group Ltd
In Collaboration With :