TSMC AP7
Taipei, Taiwan
Project Period : 2024-2026
Façade type/System : Unitized Curtain Wall and Horizontal Sunshade
Facade Area : Unitized CW = 16,227 m.2 and Horizontal Sunshade = 2,711 lm
Scope of Work : Design, SDW, Eng, BoM, Fab Dwg, Material Procurement, Fabrication and CIF Shipping
Property Owner : Taiwan Semiconductor Manufacturing Co., Ltd
Developer : Taiwan Semiconductor Manufacturing Co., Ltd
Local Architectural : JJP Architects & Planners
Façade Consultant : Siang Bo Metal Building Material Co., Ltd
Main Contractor : Kedge Construction Co., Ltd
Taiwan Exclusive Representative : Interarch Engineering Solution Co., Ltd/ Kinzi (Thailand) Co., Ltd
In Collaboration With :